TABLE OF CONTENT

 

Volume 3a

 

Appendices

Appendix 3.1        Calculation of Emission Rates (Fugitive Dust)

Appendix 3.2        Baseline Odour Survey Report

Appendix 3.3        Calculation of Odour Emission Rates (PTWs)

Appendix 3.4        Calculation of Odour Emission Rates (SCISTW)

Appendix 3.5        Fugitive Dust Results (Unmitigated)

Appendix 3.6        Fugitive Dust Results (Mitigated)

Appendix 3.7        Odour Assessment Results

Appendix 4.1        Fixed Plant Noise Criteria

Appendix 4.2        Background Noise Survey Report

Appendix 4.3        Powered Mechanical Equipment (PME) for the Different Construction Tasks During Normal Daytime Working Hours (Without Mitigation Measures)

Appendix 4.4        On-site Noise Measurements for Existing Facilities at PTWs

Appendix 4.5        Fixed Plant Inventory

Appendix 4.6        Calculations and Results of Construction Noise Impacts During Normal Daytime Working Hours (Without Mitigation Measures)

Appendix 4.7        Calculations of Operational Noise Levels at Representative Noise Sensitive Receivers (Unmitigated Scenario)

Appendix 4.8        Powered Mechanical Equipment (PME) for the Different Construction Tasks During Normal Daytime Working Hours (With Mitigation Measures)

Appendix 4.9        Calculations and Results of Construction Noise Impacts During Normal Daytime Working Hours (With Mitigation Measures)

Appendix 4.10      Calculations of Operational Noise Levels at Representative Noise Sensitive Receivers (Mitigated Scenario)

Appendix 4.11       Calculations and Results of Construction Noise Impacts During Restricted Hours (Without Mitigation Measures)

Appendix 4.12      Calculations and Results of Construction Noise Impacts During Restricted Hours (With Mitigation Measures)

Appendix 5.1        Source Level of the TBM from KSL EIA Report

Appendix 5.2        Detail Calculations of Groundborne Noise Assessment

Appendix 6.1        Near Field Modelling Result

Appendix 6.1a      Emergency Discharge and Temporary Bypass Scenarios

Appendix 6.2        Water and Sediment Quality Monitoring Stations for Stage 1 Outfall Performance Verification

Appendix 6.2a      Methodology for Compiling the Pollution Loading Inventory

Appendix 6.3        Model Results for Seawater Intakes

Appendix 6.4        Model Results for Gazetted and Non-gazetted Beaches

Appendix 6.5        Model Results for Marine Ecological Sensitive Receivers

Appendix 6.6        Relative Contributions of P Levels from Different Pollution Sources at Semi-enclosed Bays

Appendix 7.1        Methodology for Human Health Risk Assessment

Appendix 7.2        Detailed Assessment Results of Human Health Risk Assessment